2002 Land Rover Discovery Series Ii Sd Sport Utility 4-door 4.0l on 2040-cars
Teaneck, New Jersey, United States
Fuel Type:GAS
Engine:4.0L 3950CC V8 GAS OHV Naturally Aspirated
Vehicle Title:Clear
Transmission:Automatic
Make: Land Rover
Model: Discovery
Mileage: 120,917
Trim: Series II SD Sport Utility 4-Door
Warranty: Vehicle does NOT have an existing warranty
Drive Type: 4WD
Options: 4-Wheel Drive, Leather Seats, CD Player
Number of Cylinders: 8
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag, Side Airbags
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
HI UP FOR SALE IS 2002 LAND ROVER DISCOVERY SERIES II SD SPORT UTILLITY 4-DOOR
Land Rover Discovery for Sale
- 2003 land rover discovery se
- No reserve 4x4 dual sunroof cold a/c clean 3rd row seat tow pck run/drives great
- 2003 land rover discovery se ,runs well,clean,no reserve.
- <<< 2003 land rover discovery se - rare icelandic blue - 19" rr wheels - loaded!
- Super sharp (( white/ tan...3rd row...mnroof...loaded )) must sell
- Discovery 4wd se - low reserve - heated leather - dual power sunroofs
Auto Services in New Jersey
Wales Auto Body Repair Shop ★★★★★
Virgo Auto Body ★★★★★
VIP Car Care Center Inc. ★★★★★
Vince Capcino`s Transmissions ★★★★★
Usa Exporting ★★★★★
Universal Auto Repair, Inc ★★★★★
Auto blog
Jaguar Land Rover opens winter testing facility in Minnesota
Wed, 12 Dec 2012As it begins the rollout of the all-wheel-drive Jaguar XJ and XF models, Jaguar Land Rover has just announced that it has opened a new facility in northern Minnesota for winter testing. Located in International Falls, MN (on the US and Canadian border), the British automaker says it is one of the coldest locations in the Continental US. Jaguar's new Instinctive All Wheel Drive system was developed primarily to help sell more cars in the northern US, so it only makes sense to open a testing area in the US as well.
With temperatures that can drop to minus 55 degrees Fahrenheit, International Falls was chosen to mimic some of the worst weather a Jaguar or Land Rover will ever see. The grounds house testing chambers, various road surfaces and even a frozen lake. This new facility complements the hot-weather testing grounds in Phoenix, AZ.
The official press release is posted below.
Jaguar Land Rover in talks for Southern US factory
Mon, 20 Oct 2014Jaguar Land Rover is getting serious about global expansion, and that means it can't only build its vehicles in the UK anymore. The British automaker is cutting the ribbon at its new plant in China tomorrow, marking the opening of its first factory outside the UK. In 2016, it will open another factory in Brazil. But the latest intel has it that JLR is looking into a US factory, as well.
The report, which comes to us from the Sunday Times by way of Automotive News Europe, indicates that the company is evaluating locations for a North American factory, with options centering around Southern right-to-work states like South Carolina, where BMW operates its plant in Spartanburg and a wide array of other automotive operations are based as well. The JLR plant would reportedly ramp up to a capacity of 200,000 units per year.
In related news, while that new plant JLR is inaugurating in Changshu, China, is initially slated to produce the Range Rover Evoque, it is also expected to start building the new Discovery Sport as well - just like the Halewood plant in the UK that has handled Evoque assembly from the start and which just built its first Discovery Sport, as well.
Jaguar opens new engine plant in the UK
Thu, 30 Oct 2014The heads of Jaguar Land Rover are having a busy couple of weeks opening factories. Just days after inaugurating the company's first overseas plant in China, the automaker's new Engine Manufacturing Center in the UK is being inaugurated, as well. The plant near Wolverhampton, England, marks the first time in decades that JLR is building its own powerplants in-house. Further signaling the importance of this launch for the business, Queen Elizabeth II and Prince Philip were on hand and even tweeted about it.
The factory's first major project is to build JLR's latest Ingenium four-cylinders, starting with the 2.0-liter diesel version. "Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment," said Trevor Leeks, plant operations director in the automaker's announcement.
Opening the doors to the Engine Manufacturing Center has been years in the making for JLR. The plant was first announced in September 2011 and broke ground in June 2012. Building it cost the company 500 million pounds ($800 million) and created 1,400 new jobs. Of course, being a state-of-the-art factory, considerations were made to make the place as energy efficient as possible. That meant installing the UK's largest solar array with 21,000 panels to produce about 30 percent of the site's electricity needs.