Se Luxury Hybrid-electric 2.0l Cd 2.0l Atkinson Plug-in Hybrid I4 Engine (std) on 2040-cars
Hilton Head Island, South Carolina, United States
Ford Aerostar for Sale
- Electric nav cd 107-kw electric motor (std) keyless start front wheel drive(US $22,605.00)
- Nav cd 107-kw electric motor (std) front wheel drive power steering abs(US $22,297.00)
- 6.8l 6.8l sohc efi 3-valve v10 triton engine (std) dual rear wheels abs(US $22,000.00)
- Convertible 5.0l cd 5.0l 4v ti-vct v8 engine (std) rear wheel drive fog lamps(US $28,990.00)
- 2003 ford thunderbird convertible/hardtop-white-torch red-black conv & interior(US $16,500.00)
- 1997 ford f-350 7.3 diesel crew cab 4x4(US $12,550.00)
Auto Services in South Carolina
Wingard Towing Service ★★★★★
Sumter Tire Plus LLC ★★★★★
Stepp`s Garage & Towing ★★★★★
Stateline Auto Brokers ★★★★★
Patterson`s Towing & Recovery ★★★★★
Parish Automotive ★★★★★
Auto blog
Ford and Chrysler reducing summer plant shutdowns
Wed, 22 May 2013Most domestic automaker assembly plants traditionally take a couple of weeks off during the summer. The shutdowns give each plant time for much needed repairs and maintenance, and in some cases, help better align production with demand. Not this year, though, as demand for many models is outstripping what Ford, Chrysler and General Motors plants can produce.
Ford has announced that it will shorten its annual summer shutdown for most North American plants from two weeks to one. The shorter shutdown will increase the carmaker's annual North American production by 40,000 units on top of the 200,000 extra units that it was already planning to produce this year versus last. Automotive News reports that Ford produced 2.8 million vehicles on this continent in 2012, and that output this year has already increased 13 percent through April.
Chrysler, meanwhile, is also operating at full tilt and plans to run some plants through the summer with no shutdown at all. Those not getting a break include Jefferson North where the Jeep Grand Cherokee and Dodge Durango are assembled, Toledo North that will assemble the new Cherokee, and Conner Avenue, home of SRT Viper production. Other assembly plants will be down for a single week, while all of Chrysler's engine and transmission plants except one in Indiana will continue operating with no shutdown this summer.
Barrett-Jackson 2014: First production 2015 Ford Mustang earns $300k for JDRF [w/video]
Sat, 18 Jan 2014We've almost become immune to the huge dollar amounts that collectible cars earn for charity at Barrett-Jackson. To wit, $300,000 for the first production 2015 Ford Mustang initially didn't seem like very much money. In reality, though, it's probably about 10 times the actual asking price for the car, and we're pleased to report that 100 percent of the proceeds will go to the Juvenile Diabetes Research Foundation.
According to Ford, the car's winning bidder will get to "choose a fastback with manual or automatic transmission, and any interior, exterior and stripe color combination offered by Ford on the all-new Mustang." Power will come from a slightly revised version of the well-known 5.0-liter V8 engine that will produce "more than 420hp and 396 pound-feet of torque."
We snapped live images of the 2015 Mustang prototype that Ford had on display here at Barrett-Jackson, and you can check them out above. The official auction description, along with a video of the auction as it happened live, is below.
Ford Fusion production scaled back just 3 months after it was accelerated
Mon, 02 Dec 2013Three months after kicking off production of the Ford Fusion at its Flat Rock, MI factory, Ford Motor Company is taking steps to trim output in the face of heavily discounted competition from Toyota and a growing supply of vehicles.
The addition of Fusion production in Flat Rock - which also builds the Mustang - was meant to be what pushed the handsome mid-sizer past its arch-nemesis, the Toyota Camry. An extra facility building Fusions was also meant to curb the growing demand for Ford's highly profitable sedan.
But with word that Flat Rock would take "approximately" one extra week off for the holidays combined with an 88-day supply of Fusions - reportedly due in no small part to what Morgan Stanley analyst Adam Jonas called "aggressive discounting of the Camry" - some analysts are now beginning to wonder if Ford may have overextended itself by adding a second Fusion facility to the mix.